Project: N524JL/N87JL   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Jeremy Leonard   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1074
Total Flight Time:
Start/Last Date:Mar 17, 2021 - No Finish Date
Engine:Lycoming IO360M1B
Propeller:Sensenich 3 Blade Composite Ground Adjustable/Fixed pitch
Panel:Garmin G3XTOUCH/GNX375/G5/GTR200/GFC507
 
Friendly URL: https://eaabuilderslog.org?s=N524JL/N87JL

Home or Last Project Picture

Aug 10, 2021     Trailing edge time - (5 hours)       Category: Empennage
I started the trailing edge by taping the 3M tape to both sides of the wedge and leaving it to cure. I then followed the directions in section 5 and thankfully got it so the tape was stuck to both skins and the wedge. I then clecoed everything to a piece of aluminum angle that was previously drilled and let it set for about 4 days to cure (4 days because I had other things going on). I removed the angle, double flush riveted according to section 5 and using the angled dies from Cleveland for the pneumatic squeezer. Maybe not perfect but I think it will work. Onto the leading edge.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.